Here is a note I received from Wayne about the status of pool installation:

They did not pour patio or pool equipment pad as Wenatchee Sand and Gravel was out of stock on the Ginger Color. Rob said should be by Friday.

Rob also talked with Dave the pool installer and he indicated digging should start toward end of next week. The pool was either ordered late or manufacture took longer than expected to make the pool. Another setback, but I called the landscaper and it actually works better for him to start a week later.

I made quite a few calls trying to fine tune schedules as we do not want any more delays in closing than anticipated at this point. Closing hopefully May 1st through maybe the 8th or 9th.
-Wayne